Stars Over the River Drin backdrop
Stars Over the River Drin poster

Stars Over the River Drin

10.0/ 10 · 0K votes
1978-04-25
1h 9m
SQ
Released

Storyline

After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.

0

Cast

Reviews

Be the first to review this title.

Stars Over the River Drin (1978) | CineScope